Cost data

Your company's own pricing history. Budget a trade nobody quoted, browse projects and trades, and inspect any recorded quote.

Cost Data (Intelligence > Cost Data) is your company's pricing history: every quote recorded from your jobs, by project and trade.

Budget an uncovered trade

When no sub has quoted a trade yet, get a budget number from your own history:

  1. Trade (required), and the Quantity and Unit if you have them.
  2. Project SF, Region, or an Item or keyword to narrow it.
  3. Click Estimate. Clear empties the form.

The answer comes from your company's own history only and is always budget-grade: it shows the history it rests on and never counts as a quote. Carry it only as a budget, tagged so (see the BASE BID estimate).

Find a supplier product price

Ask crux to search for the product, such as "birch plywood". The search checks both the item price list and the saved lines of current quotes. You can narrow the search by trade, region, CSI section or quote date.

Quote results show the supplier, source file, quantity, unit, printed unit price and line total. A linked price-list copy appears once with its quote evidence. A missing unit price stays blank. Crux does not divide a group total by its quantity to invent a price.

Each supplier product keeps the name, unit, quantity, unit price and line amount read from the quote. A printed zero stays on its line and does not become a paid unit rate. Budget calculations continue to use recorded unit rates.

Repair sources after moving a job

Open the moved job in crux so it records the move. Then ask crux to repair that job's saved quote locations.

The repair uses the job's saved move history. It changes only the old folder prefix in quote records and their intake receipts. It keeps the rest of each location and all prices. It never opens or re-reads the quote files. A copied job keeps the original job's quote paths untouched.

If a source file is still missing, check its folder and filename. Path repair cannot restore missing product names, prices or pages. After confirming the source, read it and review any corrected quote details before replacing old pricing records.

Projects

Every project in the history: its code, building use and type, bid date, outcome and size. Click one for its project profile and its recorded quotes.

The × at the end of a row removes an empty project (one with no quotes or cost rows): click it, then remove? to confirm within a few seconds. A project that still has quotes is refused, and nothing changes.

Trades

Each trade with its number of quotes and the average quote. Click one for the trade detail: its history, the median and the range.

Recent quotes

The latest current quotes: project, trade, subcontractor, date and amount. Superseded, pending and auto-captured rows are left out. Click Inspect quote for its quote evidence: the source file, the pricing method, the base, line items, alternates, inclusions and exclusions, its confidence, and the original base quote when it was revised.

Where the quotes come from

Every quote crux reads for a job (in leveling, on bid day, or when you say "review this quote") is recorded here with its source file, date and project. Nothing is typed in by hand. See Records and win/loss.