Before you start
- Onboard the bid first, so crux knows the sheets, the finish schedule and the paint schedule.
- The drawings should be PDF files made by the design software (with real lines). A scanned sheet is only a picture: crux cannot measure it and tells you so. Ask for the PDF drawings, or measure that sheet yourself with Edit by hand.
1. Ask for it
In the job's chat, ask: "do the takeoff". crux sets up the conditions from the schedules (walls by height band, ceilings, doors and frames, and so on) and starts measuring. For a single quantity, use the Quick takeoff quick action instead.
Open the Takeoff tab to watch. It says Live: crux is working here while crux draws.
To continue saved work after reopening crux, ask "continue the takeoff" in the job's chat. crux reopens the saved drawing files and keeps your measurements and scales.
crux recognizes a saved drawing by its contents, not its folder. If the job folder moved, was renamed, or is opened from a different drive letter, crux finds the drawings in their new place.
If crux cannot find a saved drawing, check that the file is still in the job folder and opens, then ask to continue again. Your saved takeoff stays intact, and crux keeps a copy of it in the takeoff's history folder.
If a different drawing, or a different version of a saved drawing, was open when you asked to continue, crux closes it, names it in the reply, and goes back to the saved drawings. Measurements made on it are not added to the saved takeoff. If they were not saved yet, crux keeps them in the takeoff's history folder and the reply says where.
If a drawing was re-issued under the same file name since the takeoff was saved, crux still opens your saved takeoff on the new file. The reply names each changed drawing: check its measurements and scales. This check includes every added drawing file. When an addendum reissues a sheet you measured, crux flags the shapes on it. See Re-check your takeoff.
2. Confirm the scale
Each sheet's scale shows in the scale chip at the top left. When crux set a scale from the sheet, the chip turns amber until you check it: open it and click Confirm. A confirmed scale is one of the checks crux runs before the quantities are used.
3. Give the heights
Walls need a height to become square feet. When the documents do not give one, crux asks you in the chat (or on the Documents tab's Needs you card) and the walls stay amber until you answer. crux never assumes a height.
4. Check and approve
- When the drawings state an independent total, such as a gross area, footprint or scheduled count, crux records a comparison with what it measured. A difference over 2% fails the takeoff check until the geometry is measured again.
- Shapes crux proposed are dashed. The Approve bar at the bottom says how many are on this sheet.
- Click a shape to see its quantity and how it was measured. Approve or Reject it, or Ask crux to fix this to send crux a note about it in the chat.
- Fix… on the Approve bar asks crux to fix the sheet in chat. Approve N approves every proposed shape on the sheet you are looking at.
- Approved shapes turn solid. Approving in chat does not count; only the canvas approves.
5. Use it
The condition cards on the Takeoff tab show each condition's total and how many shapes are still proposed. When the takeoff is approved, ask crux to build the estimate. See Build the estimate.